2018 | AFC ACCOMPLISHMENTS 113 Figure 5. Fuel pellets being loaded into ATF-2 fuel rodlet. by INL.The receipt process included a thorough review of as-built information and inspections as performed by the partner.Additionally, some inspections were performed on-site at INL as verification of critical characteristics to ensure both programmatic and safety requirements were met. Twenty-six test specimens, including fifteen assembled by INL, were qualified for irradiation testing within the 2A loop of ATR in support of the ATF-2 experiment.