b'5.6 DIVIDER PHOTO CAPTIONSPage 2 Page 93Transverse metallography of theInstrumented Assembled THOR-FAST-008 pin across the centerMOXTOP-1. (T. Smuin)of the pin. (B. Beausoleil/L. Capriotti).Page 4 Page 107Uprighting LOC-C-1 in the standRing tension testing of ATF (in TREAT). (T. Pavey) cladding with the furnace and load frame in the HFEF hot cell. (R. Hansen)Page 83 Page 131Joseph Cummings and TravisTEM characterization results of Callison removing LOC-C-1fuel-Cr diffusion barrier inter-from the stand in preparation toacting interface. (Y. Wang)placing into the Big-BUSTER. (T. Pavey)242 2023|AFC ACCOMPLISHMENTS'