b'Table 1. Burnup Accumulation of All Rods Irradiated in ATF-2 Before ATR Core Internal Changeout"164A 164B166A166B168A168B169A (6/12/18- (9/19/18- (7/25/19- (11/11/19- (4/15/20- (8/20/20- (2/5/21-8/17/18) 1/17/19) 9/24/19) 1/10/20) 7/22/20) 10/19/20) 4/6/21)R-04 2.6 5.8 9.3R-05 2.6 5.8 9.3R-06 2.7 6 9.5R-07 2.6 5.8 9.2R-08 2.7 5.9 9.4R-09 2.6 5.9 9.4R-10 3 6.5 10.3R-11 2.9 6.4 10 14.9 19.63 23.9 28W-01 2.3 5.2 8.1W-02 2.3 5.1 8W-03 2.4 5.2 8.2W2-02 4.8 9.2 13.5W2-03 4.8 9.1 13.3W2-05 4.7 8.9 13INLs engineering process to produceat atf.inl.gov. A list of all the test rods high quality data. Power historiesirradiated to date and their burnup have currently been evaluated throughaccumulation is shown below in Table cycle 166B and a plot of test rod1 along with preliminary results from AR-15s power history is shown belowcycle 168A and projects for the next in Figure 3. Further test data can betwo cycles before CIC 168B and 169A.found on the ATF database website 2020|AFC ACCOMPLISHMENTS 85'