A DOE Level 2 milestone represents a crucial checkpoint in the Department of Energy's project management framework, designed to guide complex projects with precise goals and thorough oversight. These milestones are linked to specific deliverables, the completion of key project stages, or pivotal decision points. They necessitate careful planning, coordination among various teams and stakeholders, and typically undergo rigorous review and approval procedures. Successfully meeting a Level 2 milestone may trigger the commencement of the next project stages, thereby helping to maintain the project's adherence to its planned timeline, budget, and quality benchmarks.
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report
YearWork Package TitleSiteMS Title
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test LOC-C-3
2024TWIST CommissioningINLComplete irradiation of TWIST Commissioning Test TWIST-RIA-C
2024HERA HBU TestingINLComplete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests.
2024PIE of Byron HBU Fuel PinsINLReceive Byron Fuel Shipment
2024PIE of Byron HBU Fuel PinsINLInitiate hydrogen and burnup measurements on Byron HBU supporting refabrication
2024AR Campaign ManagementINLDraft topical report on reference metallic fuel design basis
2024Advanced Fabrication DevelopmentINLIssue Report on metallic fuel Fabrication Technology Gaps
2024AR Irradiation TestingINLFIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2024Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2024Metallic fuel assessment and model developmentINLPreliminary metallic fuel performance code assessment to support topical report development
2024PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFFINLDraft manuscript on new FCCI data Ð microstructure and micro mechanical characterization
2024Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain MeasureINLReport on hotcell DIC options and conceptual design details
2024I-Loop InstallationINLRelease the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP
2024I-Loop InstallationINLDevelop draft strategy to establish US domestic I Loop Tube supply capability
2024I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2024Refabrication/Reinstrumentation Capability DevelopmentINLPerform refabrication on a Byron fuel rodlet
2024Accelerated ceramic fuel developmentLANLReport on Thermomechanical property and creep behavior of ATF ceramic fuels
2024Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication of FAST test articles, both Cr-doped and undoped UO2
2024Mechanical testing and modeling of claddingLANLReport on FeCrAl deformation creep model refinement
2024AR Roadmap and constitutive creep model developmentLANLPrepare draft Advanced reactor cladding roadmap program plan
2024Fabrication and Characterization of Coated CladdingORNLReport on The effects of heating rate and hydrogen on cladding creep behavior
2024High Burnup Fuel PerformanceORNLReport on H.B. Robinson LOCA Test and PIE
2024High Performance ATF (SiC) Cladding DevelopmentORNLReport on SiC modeling Supporting Tube bowing evaluations
2024SiC Cladding HFIR Irradiation DesignORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness
2023Integral Irradiation TestingINLIssue ATF-2 Ramp Conceptual Design Report
2023HERA PreH CampaignINLFirst two experiments on pre-hydrided cladding ready for irradiation
2023HERA HotcellINLPIE report on HERA PreH Series
2023ATF/HBU Transient TestingINLComplete HBU LOCA experiment preliminary design
2023ATF PIE INLINLCoated Cladding Performance in ATF2 Comparison Report
2023AR Campaign ManagementINLDraft Metallic Fuel Research and Development Plan
2023AF Irradiation Testing & PIEINLDraft manuscript on destructive PIE and assessment on FAST-1 rodlets
2023Complete ARES Phase I project - irradiation and PIEINLComplete assembly and irradiation of first previously irradiated pin in THOR
2023Complete ARES Phase I project - irradiation and PIEINLComplete THOR-MOXTOP test plan in BUSTER (nominally 4 transients)
2023Complete ARES Phase I project - irradiation and PIEINLPreliminary assessment and PIE report for THOR metallic fuel experiments
2023Na loop infrastructure at IDEFINLPlace order for a new glovebox
2023Na loop infrastructure at IDEFINLReceive the sodium Test Loop from TerraPower
2023Design and Install I-loopINLComplete Transfer Shield Plate final design
2023Design and Install I-loopINLInitiate procurement of four primary loop coolant pumps
2023Design and Install I-loopINLComplete conceptual design Cubicle and Cleanup System
2023Design and Install I-loopINLComplete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC
2023TWIST CommissioningINLFirst commissioning test assembled
2023TREAT Reinstrumentation Capability (non capital)INLComplete fabrication of a new in-cell welding under pressure system (ICWUPS)
2023Accelerated Ceramic Fuel DevelopmentLANLPrepare Handbook for ATF doped UO2
2023Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2023Mechanical testing and modeling of Coated ZircaloyLANLComplete high temperature ringpull tests on Cr coated Zircaloy Tube
2023Matrix/BOR-60 shipment support plus line 35 type SOWsLANLSummary of HT9 and CWD9 cladding properties, design equations, and data gaps
2023Fabrication and Characterization of Coated CladdingORNLSummary of LFA measurements on Cr-coated cladding tubes
2023Fabrication and Characterization of Coated CladdingORNLSummary of the impact of the coating on high temperature creep and burst margin
2023ATF Fuel SafetyORNLReport summarizing SATS enhanced capabilities and hot cell readiness
2023High Burnup Fuel PerformanceORNLReport summarizing tFGR and visualization data on high burnup
2023High Performance ATF (SiC) Cladding DevelopmentORNLSiC/SiC Development Strategy and 5-yr Execution Plan
2022Integral Irradiation TestingINLATF-2C test train top tier assembled and ready for insertion
2022HERAINLFirst two experiments on pre-hydrided cladding ready for irradiation
2022Integral Transient TestingINLDraft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT
2022ATF Post Irradiation ExaminationINLDraft Manuscript on optimized tensile testing of irradiated cladding
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLConduct Preliminary Design Review for THOR Remote Handling and Process Equipment
2022ARES - joint work with JAEA to study off-normal behavior of fast reactor fuelsINLComplete THOR commissioning test plan in BUSTER (nominally 3 transients)
2022Accelerated Ceramic Fuel DevelopmentLANLStatus report on doped UO2 properties and performance
2022Accelerated irradiation and qualification of ceramic nuclear fuelsLANLFabrication and shipment of ATF pellets for ATR insertion
2022Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2022Develop HBu Transient FGR CapabilityORNLReport summarizing design for SATS fission gas release capability and proof of concept experiment demonstration
2022Characterization of High Burnup Fuel SamplesORNLReport summarizing high burnup microstructural data of commercially irradiated fuel
2021AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2021Integral Irradiation Testing of ATF in ATRINLIssue ATF-2B Final Irradiation Report
2021ATF PIE - Coordination /SupportINLComplete Mechanical Testing Demonstrations
2021LOCA Commissioning Capsule TestsINLComplete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT
2021HERAINLConduct Final Design Review for Simulated HBU Test for HERA
2021Demonstration TREAT Tests on Previously Irradiated FuelINLComplete first TREAT test with Previously Irradiated Fuel
2021Perform evaluation of FAST application to U-10Zr/HT9 systemINLReceipt of Irradiated FAST-1 capsules at HFEF
2021ARES Joint work with JAEA to study off-normal behavior of fast reactor fuelsINLPerform first modern transient irradiation experiment on metallic fuel
2021TREAT Refabrication Capability (Capital)INLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2021TREAT Reinstrumentation CapabilityINLIssue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple.
2021ATR I-Loop Installation (capital - TEC)INLReceive Top Head Closure Plate from vendor
2021ATR I-Loop Installation (capital - TEC)INLReady to Install and Test THCP
2021Advanced Ceramic Fuel DevelopmentLANLReport on the integrated experimental and modeling approach to enhanced grain size UO2
2021Interface Mechanical property testing for coated zircaloyLANLIssue report on bulge testing and microscale testing on coated zircaloy
2021Fabrication and Characterization of Coated CladdingORNLIssue report documenting characterization of coated Zry-4 cladding for round robin testing
2021ATF Irradiation and Accelerated QualificationORNLHFIR SiC Bowing Test Ready to Insert
2021Transient TestingORNLIssue report on impact of Cr coatings on transient response
2021Westinghouse ATF FOAPNNLPNNL - W/Byron spent fuel rods feasibility assessment
2020AFC Coordination and IntegrationINLComplete Draft 2020 Accomplishments Report
2020ATF-2 ATR Loop DesignINLNew ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion
2020ATF Transient TestingINLPerform transients on ATF concepts in SETH capsule (~3 transients)
2020ATF Transient TestingINLComplete MARCH-SERTTA commissioning tests
2020LOCA TestingINLComplete preliminary design of TREAT LOCA test
2020Irradiation Testing in ATRINLFAST-1 accelerated test ready for insertion in ATR
2020Remote Handling Capability for Transient TestingINLDemonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell
2020Re-fabrication and Instrumentation TechniquesINLDemonstrate ability to perform re-fabrication of fuel rods in mockup
2020Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLIssue Report Summarizing Complete PIE of Gen1 MiniFuel Samples
2020Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2025Database/SASANLComplete the quality assurance of the irradiated EBR-II metallic fuels data for examinations most useful for industry licensing including neutron radiograph, profilometry, precision gamma spectrometry, and metallography data
2025HBU Safety TestingINLComplete assembly of TWIST-RIA-C and transfer to TREAT
2025NT ATF I-Loop InstallationINLComplete fabrication of the Transfer Shield Plate and Shield Cylinder
2025NT ATF I-Loop InstallationINLReady for installation of the TSP/SC
2025NT ATF I-Loop InstallationINLComplete Fabrication of the I-Loop Proof of Concept
2025HBU Safety TestingINLComplete assembly of HERA-HBU-1
2025Transportation SupportINLComplete Readiness at INL to ship and receive ATF segments in the BRR cask
2025NT ATF I-Loop InstallationINLComplete final design of the I-Loop Tube
2025Transient Testing PIEINLComplete axial gamma scan of LOC-C-2 test rod
2025HBU Pin RefabricationINLComplete refabrication of a high-burnup fuel rodlet
2025PIE of Byron HBU Fuel PinsINLFinish rough sectioning the 5 rods designated for HBU research from the Byron shipment
2025ATF Campaign ManagementINLComplete Draft 2025 Accomplishments Report
2025SiC I-LoopINLRelease RFP for the Motor Control Centers (MCC)
2025SiC I-LoopINLRelease RFP for the Gen I stainless steel prototype I Loop Tube
2025TREAT SiC experiment design support and collaborationINLComplete a design report of enhanced capability for SiC in TWIST
2025Experiment Validated Multiscale Models for SiC CMCINLStatus update on SiC multiscale model and risk informed model
2025Long Term Irradiation TestingINLIrradiation Testing Plan for Long Term ATF
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLComplete THOR-MOXTOP-2 test plan (nominally 2 transients)
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLHigh burnup metal fuel THOR experiment ready for hot-cell fuel loading
2025Complete ARES metal fuel experiments - irradiation and post-test analysis (THOR-C-4 and MLOF)INLReady to irradiate fresh fuel THOR-C experiment
2025Advanced Fabrication Development INLReport on Fuel Properties Measurements
2025Irradiation Testing INLIMPACT Experiment Ready to Irradiate
2025MF Campaign Management INLComplete report on reference fuel design qualification basis
2025Metallic Fuel PIE (FAST & Legacy)INLSubmit manuscript on thermal props of irradiated U-10Zr
2025Metallic fuel assessment and model developmentINLComplete draft report on BISON application to metal fuel design basis
2025AGR Fuel Post-Irradiation ExaminationINLComplete solid-state gamma analysis of three of six graphite holders and other capsule components from all five capsules to support the mass balance calculations for AGR-5/6/7
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II qualifications and initial installations of components of the Air/Moisture Ingress Experiment
2025AGR Fuel Post-Irradiation ExaminationINLComplete three (3) tests of AGR-5/6/7 compacts in Fuel Accident Condition Simulator (FACS) furnace at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete fabrication and qualification of irradiation capsule and in-cell furnace for testing of irradiated AGR-5/6/7 fuel in NRAD and measure fission gas release using the in-cell furnace at HFEF
2025AGR Fuel Post-Irradiation ExaminationINLComplete Phase II-B Qualification of AMIX to include the completion of remote qualification in mockup at FCF
2025AGR Fuel Industry SupportINLHost a workshop with key industry and national lab stakeholders to discuss future coated particle fuel development needs
2025AGR Fuel Planning and ReportingINLSummarize lesson learned from the AGR Program experience over the course of its 23 year history
2025AGR Fuel Post-Irradiation ExaminationINLComplete Installation of AMIX furnace in the hot cell at the Fuel Conditioning Facility at MFC (INL)
2025AGR Fuel Post-Irradiation ExaminationINLComplete AGR-5/6/7 Precision Gamma Scanning (PGS) Graphite Holders and Compacts Report at INL
2025AGR Fuel Post-Irradiation ExaminationINLComplete radiochemical analysis of all AGR-5/6/7 compacts from DLBL at Analytical Laboratory at INL
2025HT9 Welding, creep model development and implementationLANLExtended surrogate model for HT9
2025High Burnup Fuel PerformanceORNLSummary of high burnup tFGR testing and PIE at ORNL
2025Lifetime and Performance of LWR CladdingORNLATF Cladding Mechanical Properties Report
2025High Performance SiC cladding DevelopmentORNLDevelopment of SiC cladding R&D execution plan with industry input
2025SiC Irradiation Vehicle Design ORNLHigh Temperature SiC Cladding Bowing Irradiation Design and HFIR Readiness
2025Fab development and Transient Testing of SiCORNLEstablish laboratory-scale SiC composite tubes Production capabilities
2025Post-irradiation Examination of 1st Gen. Alumina Forming AlloysORNLDevelopment and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) tests of AGR-5/6/7 compacts in the Core Conduction Cooldown Test Facility (CCCTF) at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete three (3) deconsolidation-leach-burn-leach (DLBL) operations on AGR-5/6/7 compacts at ORNL
2025AGR Fuel Post-Irradiation ExaminationORNLComplete PIE report on AGR-5/6/7 capsule 2 compacts at ORNL
2019Campaign ManagementINLFinal Report to DOE on Halden Gap Analysis for ATF
2019Campaign ManagementINLCo-host (w/GAIN) Advanced Reactors Fuels Industry Workshop
2019Baseline Integral Tests in TREATINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2019Baseline Integral Tests in TREATINLComplete ATF-SETH testing in TREAT
2019ATF SiC Cladding and Core Component DevelopmentORNLSystematic Technology Evaluation Plan (STEP) for SiC as BWR channel box
2019Baseline Integral Tests in TREATINLUpdate ATF-3-1 RIA Test Plan
2019Advanced Ceramic Fuel Performance and QualificationLANLU3Si2 pellets fabricated with controlled microstructures ready for HFIR MiniFuel irradiation
2019Irradiation Testing CapabilityINLConduct Super-SERTTA Preliminary (60%) Design Review
2019Advanced Ceramic Fuel DevelopmentLANLReport on waterproofing UN studies
2019Evolution of Fuel Structure, Chemistry, & Properties following IrradiationORNLReport on structure, chemistry, property assessment capabilities for PIE of MiniFuel geometries
2019Baseline Integral Tests in TREATINLUpdate ATF-3-2 LOCA Test Plan
2019Baseline Integral Tests in TREATINLReady to perform first RIA in TREAT on unirradiated ATF (ATF-3-1)
2019Small Scale Mechanical and Ion Irradiation Testing of FeCrAl alloysLANLIssue report on advanced microscale testing on FeCrAl tubing and correlate measurements to macroscale testing results
2019Materials Modeling in Support of ATF Fuel DevelopmentORNLSummary Report on Advanced Fuel Mechanics Modeling of SiC-clad Fuels
2019ATF-2 loop testing and redesignINLDesign approved for modifications to the ATF-2 test train for BWR rodlets.
2019ATF PIEINLUpdate Report on ATF-1 PIE
2019Irradiation of ATF Concepts in HFIRORNLMonolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion
2019AR Integral Transient Fuel Performance TestingINLDevelop Test Plan for International Transient Testing Project for Fast Reactor Fuels
2019Fuel FabricationINLDemonstration of fabrication of reduced diameter metallic fuel rodlets for FAST
2019Fuel CharacterizationsINLUpdate of Metallic Fuels Handbook
2019Advanced FR Cladding DevelopmentLANLReport on and Extrude ODS tubes to dimensions needed for fueled ATR irradiations
2019Advanced Fabrication DevelopmentINLDemonstrate machining capability for plutonium-bearing fuel alloys
2019PIE and AnalysesINLIssue PIE Report on legacy EBR-II and FFTF metallic fuel experiments
2019Fuel Modeling SupportLANLIssue Assessment Report of metallic fuel swelling model vs. data
2019Irradiation Testing in ATRINLDesign review of FAST metallic fuel experiment complete
2019CX PIE InfrastructureINLDemonstrate Property Measurement on Irradiated Fuel in IMCL
2019Halden Technology Transfer and Testing AlternativesINLDevelop procurement package for hot cell fuel rod refabrication system
2018AFC Campaign ManagementINLProvide Draft Update of the ATF Roadmap to Congress including input from ATF Industry Teams
2018ATF-1 Irradiation Testing in ATR INLIssue a report documenting the development of the NDMAS ATF-2 Database and verification of data quality
2018Advanced Ceramic Fuel Performance and QualificationLANLFabricate ceramic minifuel samples and ensure they are ready to ship from LANL to HFIR for irradiation
2018Irradiation Testing of Advanced Fuels and Cladding MaterialsORNLInitiate miniature fuel irradiation in support of separate effects testing
2018ATF cladding tests under Design Basis AccidentsORNLIssue report on In-Cell Re-fabrication of Irradiated rods and LOCA Testing
2018ATF-2 ATR Loop IrradiationINLAssemble ATF-2 and ensure quality inspected test train is ready for transfer to ATR for insertion
2018Advanced Ceramic Fuel DevelopmentLANLIssue a report on the determination of the feasibility to ‘waterproof’ UN for LWR use
2018ATF SiC Cladding and Core Component DevelopmentORNLIssue Update to LWR SiC/SiC Cladding Handbook of Properties
2018ATF FeCrAl Cladding Development and TestingORNLIssue Update FeCrAl cladding handbook of properties
2018Microstructure Analysis and Evolution in Ceramic FuelsORNLIssue report on the development of a characterization methodology for separate effects testing of irradiated ceramic fuels
2018ATF Transient Irradiation TestingINLReport on results of the initial TREAT Transient Prescription Testing and Analysis
2018Static Capsule Irradiation Device PrototypeINLComplete design and build experiment support equipment to support instrumentation and controls for each experiment
2018Qualify Baseline TREAT Experiment InstrumentationINLIssue a summary technical report for instrumentation research, development, and demonstration for the transient testing
2018ATF PIEINLIssue a report documenting ATF PIE results
2018Static Capsule Irradiation Device PrototypeINLIssue a summary technical report for conceptual design of MARCH-SERTTA
2018ATF Transient Irradiation TestingINLComplete ATF-SETH testing in TREAT
2018Fuel CharacterizationsINLIssue update of Metallic Fuels Handbook
2018Advanced Fabrication DevelopmentINLDemonstrate fabrication of annular U-Zr fuel by extrusion
2018Feedstock Preparation/PurificationINLIssue report on status of Am and Np purification processes and future directions
2018High Dose Materials Testing for FRLANLPerform Testing and Issue report on tensile properties of high dose irradiated AR cladding materials
2018PIE and AnalysesINLIssue PIE Report on AFC-3C, AFC-3D, and AFC-4A
2018Fuel Modeling SupportINLIssue status report on BISON development and applications for transmutation fuels
2018Advanced Instrument Development and BRRINLCloseout Phase II Qualification of the Thermal Conductivity Microscope for IMCL
2017AFC Campaign ManagementINLEstablish a uniform framework for fuel system handbooks
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLIssue Draft U3Si2 Fuel Property Handbook
2017ATF SiC Cladding DevelopmentORNLPIE of nuclear grade SiC/SiC flexural coupons irradiated to 10 dpa at LWR temperature
2017ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2017ATF-1 Irradiation Testing in ATR INLShip First Laboratory-led ATF-1 concept capsule(s) from ATR to MFC to Support PIE initiation
2017Static Capsule Irradiation Device PrototypeINLConduct Multi-SERTTA-CAL final design review to support prototype fabrication and testing
2017ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR Installation process
2017ATF SiC Cladding DevelopmentORNLDetermination of He and D permeability of neutron-irradiated SiC tubes
2017Microstructure Analysis and Evolution in Ceramic FuelsORNLComplete detailed post-fabrication characterization of uranium bearing ceramics
2017Transient testing Coordination and testingORNLInsert Severe Accident Test Station into the hot-cell and perform demonstration test
2017Advanced High Density Fuel Development and Qualification (Advanced Ceramic Fuel Development)LANLDevelopment of Strategies to Relax Handling Constraints for High Density Fuels
2017SE testing and High Density Fuel Fabrication for Halden (ATF-1 Fabrication) LANLSeparate Effects Study of Oxygen on Fresh Fuel Properties of U3Si2
2017ATF-1 Irradiation Testing in ATR INLIssue Final report documenting irradiation status of all ATF-1 capsules
2017LWR Neutron Irradiated Materials TestingLANLReport on microstructure and mechanical properties of HFIR irradiated Gen II FeCrAl alloys
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for final assembly
2017Static Capsule Irradiation Device PrototypeINLMulti-SERTTA baseline module engineering package qualified for use in TREAT .
2017ATF-2 ATR Loop DesignINLATF-2 fueled test train ready for insertion in ATR Cycle 164-A
2017High Dose Materials Testing for FRLANLTest and Report on Ring pull testing of BOR-60 Irradiated ODS tube material
2017Feedstock Preparation/PurificationINLComplete Preparation of Metallic Am Feedstock Needed for AmBB
2017Fuel CharacterizationsINLUpdate Advanced Reactor Fuels Handbook
2017Advanced Fabrication DevelopmentINLDemonstrate Remote Casting of Metallic Fuels (in synergy with JFCS)
2017PIE and AnalysesINLInitiate Advanced PIE Studies on Metallic Fuels (EPMA of irradiated fuel in IMCL)
2017PIE and AnalysesINLIssue Rev 0 Comparison Report on Fast vs. Thermal Spectrum Testing (FUTURIX-FTA compositions)
2017Fuel Modeling Support LANLReport documenting assessment of the coupled thermal-mechanical-diffusion models in BISON for metallic fuel constituent redistribution
2017Irradiation Testing in ATRINLComplete Conceptual Design of Advanced Coatings/Liners Experiment (AFC-4F),
2017Advanced Instrument DevelopmentINLEnter TCM into stage one mockup and complete initial testing
2016AFC Campaign ManagementINLConduct Independent Technical Review of ATF concepts
2016Static Capsule Irradiation Device PrototypeINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2016Advanced Ceramic Fuel DevelopmentLANLRevision/update of SET test plan for ceramic fuels to incorporate ATF concepts
2016ATF-1 Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2016ATF-2 ATR Loop DesignINLComplete sensor qualification test (SQT) final design analysis
2016Halden ATF Test Planning and FabricationORNLIssue report documenting established input correlations for irradiation creep of FeCrAl and SiC based on in-pile Halden test results
2016ATF-1 Experiment FabricationINLComplete weld development and weld qualification for Zr and FeCrAl rodlets utilizing weep hole closure weld
2016ATF-1 FabricationLANLDevelop U3Si2 Out-of-Pile SET Plan
2016ATF Analysis in support of metrics developmentORNLDeliver report documenting Severe accident analysis of LWR core fueled with UO2/FeCrAl with updated materials and melt properties from separate effects experiments
2016Microencapsulated Fuel DevelopmentORNLProduce large batch LEU uranium nitride (UN) kernal for irradiation testing
2016ATF Transient Irradiation TestingINLIssue the ATF-3-1 Test Plan
2016Irradiation and PIE of ATF Concepts in HFIRORNLComplete report on FeCrAl irradiation testing to establish irradiated FeCrAl materials database for Gen I, Gen II, and commercial alloys
2016Halden ATF Test Planning and FabricationORNLIssue report documenting coordination, production and supply of cladding for the instrumented FeCrAl/UO2 test already planned in FY-16
2016ATF SiC Cladding DevelopmentORNLDeliver report on results from round robin testing to generate comprehensive statistical strength data on SiC tubes
2016ATF-1 Irradiation Testing in ATRINLIssue final report documenting the ATF-1B experiments prepared for ATR irradiation
2016Static Capsule Irradiation Device PrototypeINLComplete TREAT capsule device prototype component fabrication.
2016ATF-2 ATR Loop DesignINLSensor Qualification Test ready to begin ATR installation process
2016ATF-2 ATR Loop DesignINLATF-2 loop final design approval (design review closeout)
2016ATF-1 Irradiation Testing in ATRINLComplete ORNL-FCM final design
2016Advanced Reactor Fuels Irradiation Testing in ATRINLAFC-4C ready for ATR insertion cycle 158B-1
2016High Dose Materials Testing for FRLANLInitiate PIE on High Dose PHENIX-irradiated advanced cladding materials from CEA (total dose up to 70 dpa)
2016Feedstock Preparation/PurificationINLTRU Breakout Glovebox startup with 3013 can opener operational
2016Advanced Reactor Fuels Irradiation Testing in ATRINLComplete report on future AFC Test Matrix design objectives
2016Characterization of Metal Fuel SamplesINLUpdate Fuels Handbook
2016Transmutation Performance Modeling ApplicationsINLIssue Status Report on BISON Development for Fast Reactor Fuel Performance Documenting Implementation of a New Fission Gas Release Model for Metallic Fuels
2016PIE and AnalysesINLInitiate PIE of ATF-1 low burnup experiment
2016Advanced Fabrication Technique DevelopmentINLComplete fluidity studies on uranium-zirconium alloys
2016PIE and AnalysesINLIssue FUTURIX-FTA PIE Report
2016Advanced Instrument DevelopmentINLTCM ready for installation in IMCL
2015AFC Management & International CollaborationINLFinal FY14 Accomplishments Report
2015Fabrication of Transmutation FuelsINLReady to ship rodlets/capsules (2) to LANL for A-NDE-PIE trials
2015Advanced Fabrication DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2015Characterization of Transmutation FuelsINLInitiate Hot Operations in the Fresh Fuels Glovebox
2015Advanced In-situ InstrumentationINLComplete report on the TAC sensor design for the Breazeale reactor demonstration
2015Halden ATF Test Planning and FabricationORNLIssue report summarizing design and initial results from Halden Irradiation on US-contributed ATF candidate materias
2015AFC Management & International CollaborationINLCreate the Charter for an Independent ATF Technical Review Committee
2015Transmutation Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2015Advanced Technique and Fuel Material DevelopmentLANLReport documenting prelimary analysis of A-PIE examination of ATF-1/LANL-1 encapsulated UN/U3Si5 composite and monolithic U3Si5 fuel rodlets
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON simulations of JOYO/Phenix/FFTF experiments
2015Characterization of Transmutation FuelsINLIssue status report on AFC1 and AFC2 fuels Characterization
2015ATF Cladding ProductionORNLProgress report on path forward on the ATF FeCrAl Technology Implementation Plan (TIP.)
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete assessment of washout of monolithic uranium-silicides and U-Si bearing composites under prototypic PWR coolant pressures and temperatures
2015ATF SiC Cladding DevelopmentORNLSummary report on hydrothermal corrosion of SiC for application to light water reactors.
2015Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLDetermine possible routes for the synthesis of UN, UB2, U3Si5 and USi feedstock materials by direct processing of UF6 and complete summary report
2015TREAT Experiments Design and AnalysisINLComplete the draft ATF-3 Test Plan
2015Development microencapsulated fuel for advanced platforms including FCM for LWRORNLFinal report on optimized UN kernel production for LWR TRISO application.
2015Characterization of Transmutation FuelsINLIssue status report on characterization of metallic fuel with FCCI dopants
2015Feedstock Preparation/PurificationINLIssue report on Am feedstock production and characterization
2015Thin walled Tube Development and TestingORNLComplete report on optimized properties of base metal and thin-walled tube of 2nd Gen ATF FeCrAl
2015ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2015Mo Tube WeldingORNLComplete report and QA package for the EPRI ATF-1 Capsule
2015ATF SiC Cladding DevelopmentORNLComplete Status Report on Modeling, Design Tools, Joining, and Statistics of Failure: Execution and Summary Progress of Systematic Technology Evaluation Program (STEP)
2015ATF Irradiation Testing in ATRINLComplete final design review
2015Feedstock Preparation/PurificationINLIssue report on Np feedstock production and characterization
2015Transmutation Fuel Modeling SupportINLIssue status report on BISON development for fast reactor fuel performance
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and ship to INL for ATF-1 LANL-1 test insertion in ATR (ATF-1/LANL- 1)
2015ATF Cladding ProductionORNLDetermine viability of commercial heat production of ATF FeCrAl and issue summary report
2015Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2015Halden ATF Test Planning and FabricationORNLReport on design and preliminary data of Halden in-pile creep rig
2015Advanced LWR Fuel Concept AnalysisBNLPreliminary Assessment of Reactor Performance & Safety Characteristics for Key ATF Concepts
2015Advanced Fabrication DevelopmentINLIssue status report on fuel casting optimization in GACS
2015Characterization of Transmutation FuelsINLIssue Transmutation Fuels Handbook
2015PIE and AnalysesINLIssue PIE Report for AFC-2D, 2E, 3A, 3B
2015Thin walled Tube Development and TestingLANLSubmit final report on viability of thin wall tube forming of ATF FeCrAl
2015Advanced FR CladdingLANLReport on Characterization of >5 in. long tubing from Advanced ODS alloy (FCRD-NFA1) through established Fabrication Process for future Reactor Irradiation
2015AFC Management & International CollaborationINLDeliver draft implementation plan for ATF research and development (with contribution from all ATF technology leads)
2015Irradiation and PIE of ATF conceptsORNLSummary report on the effect of composition on the irradiation embrittlement of Gen 1 ATF FeCrAl
2015ATF AnalysisORNLComplete Implementation of SiC cladding fuel performance model in BISON framework
2015Irradiation Testing in HFIRORNLReport on integrated advanced characterization and irradiation of metallic fuels – HFIR irradiation work package
2015ATF-1 Pin ProductionORNLComplete Report and QA package for the second FeCrAl ATF-1 capsule
2015Transmutation Fuels Irradiation Testing in ATRINLComplete AmBB final design review and closeout EJ for ATR turnover
2015Severe Accident Test Station Installation and TestingORNLReport on final assembly, safety documentation, and approvals for fully operational in-cell Severe Accident Test Station
2015Targeted Fundamental Materials Modeling Support for ATF ConceptsORNLComplete initial thermodynamic assessment of the chemical compatibility of ceramic ATF systems outstanding in candidate fuel matrix.
2015ATR ATF Loop DesignINLComplete final design and analysis of SQ test
2015Experiment Fabrication of ATFINLComplete fabrication of qualified (green tagged) capsules for ATF irradiation experiments
2015Fabrication of Transmutation FuelsINLIssue Fabrication Report for AFC-4C fuels
2015Advanced Characterization Instrument DevelopmentINLIssue status report on TCM development and testing
2015AmBB Preparations and PlanningINLIssue status report on Am feedstock and casting trials for AmBB experiment
2015Transient ATF Loop DesignINLIssue a TREAT water loop device status report
2015TREAT Drop-in Vehicle DesignINLComplete TREAT capsule device prototype component fabrication
2015TREAT Drop-in Vehicle DesignINLComplete the preliminary design and safety analysis needs report for the TREAT static capsule device.
2015ATF Irradiation Testing in ATRINLIssue FY15 ATF ATR Irradiation Report
2015Feedstock Preparation/PurificationINLComplete installation of 3013 can opener in TRU breakout glovebox
2015Fabrication of Enriched Ceramic FuelLANLComplete fuel fabrication process development for ATF-1/LANL-2 irradiation
2015Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in fall 2015 ATR cycle (ATF-1/LANL-2)
2014Severe Accident Test Station Installation and TestingORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2014AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report (FY13)
2014Severe Accident Test Station Installation and TestingORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2014Advanced Technique and Fuel Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2014FUTURIX-FTA ReturnINLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2014AFC Campaign ManagementINLIssue Quality Implementation Plan for ATF development – (implements quality processes in accordance with the FCRD QAPP.)
2014Metallic Fuels Irradiation Testing in ATRINLFinalize test matrix for AFC-4C,4D advanced metallic fuels tests
2014ATF SiC Cladding DevelopmentORNLSummary and near term technical gaps to address for applications of SiC to LWRs
2014Advanced Technique and Fuel Material DevelopmentLANLComplete and issue summary report on Assessment of advanced sintering techniques for ATF fabrication
2014FUTURIX-FTA ReturnINLFUTURIX-FTA received at HFEF
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete evaluation of reaction energetics and temperature thresholds for selected fuel systems of relevance to accident tolerant fuels
2014Innovative LWR Metallic FuelPNNLComplete corrosion testing of advanced metalic LWR fuel concept and issue status report documenting measurements
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Planning and Fabrication of ATF cladding in support of Halden Irradiation.
2014Development of improved ATF engineering alloyORNLComplete report on production and properties of ORNL ATF FeCrAl candidate alloys
2014Advanced Technique and Fuel Material DevelopmentLANLReport on assessment of Advanced PIE capabilities and path to first A-PIE of irradiated rodlets
2014Severe Accident Test Station Installation and TestingORNLComplete report on Mechanistic assessment and model input for SiC steam-oxidation at conditions consistent with beyond design basis accident conditions.
2014LWR Fuels Irradiation Testing in ATRINLIssue FY14 ATR Irradiation Report for AFC Metallic and LWR Fuels
2014Development of improved ATF engineering alloy - Mechanical testing of initial alloyLANLComplete summary report on ion irradiation testing and characterization of FeCrAl candidate alloys
2014AFC Campaign ManagementINLIssue Draft Advanced Fuels 2014 Accomplishments Report
2014PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete nondestructive PIE for AFC-2D,2E,3A,3B
2014Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLComplete Structure-Property relation summary report for advanced composite accident tolerant fuel
2014Rev 6. of FCRD (AFCI) Materials HandbookLANLComplete Rev. 6 of AFCI Materials Handbook
2014ATF Cladding ProductionORNLReport on the development of 2nd generation ATF FeCrAl alloys
2014LWR Fuels Irradiation Testing in ATRINLInitial ATF-1 test capsules ready for insertion into ATR cycle 157B
2014Technique Application to Highly Radioactive SamplesINLInitiate Hot Operations in Fresh Fuels Glove Box
2014LWR Fuels Irradiation Testing in ATRINLAcquire GE-100 Cask
2014Fabrication of Enriched Ceramic FuelLANLFabricate composite ceramic fuel pellets and shipment to INL for ATF-1 test insertion in ATR cycle 158B
2014Fuel Performance Modeling ApplicationsINLSummary report on Accident Tolerant Fuel Modeling and International Fuel Performance Collaboration
2014ATR ATF Loop DesignINLIssue ATR ATF Loop Conceptual Design Report
2014Metallic Fuels Irradiation Testing in ATRINLIssue Preliminary Experiment Plan for New AFC Irradiation
2014Characterization of Metal Fuel SamplesINLIssue status report on AFC1 and AFC2 fuels characterization
2014Advanced Instrumentation for ExperimentsINLComplete report on in-pile measurement techniques
2014Advanced Fabrication Technique DevelopmentINLDemonstrate advanced casting into integral FCCI barrier mold
2014Halden ATF Test Planning and FabricationORNLIssue report summarizing Design and Initial Results from Halden Irradiation on US-Contributed ATF Candidate Materials
2013AFC Campaign ManagementINLConduct National ATF Metrics Workshop
2013High Dose Materials Testing for FRLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2013AFC Campaign ManagementINLIssue Advanced Fuels 2012 Accomplishments Report
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentORNLComplete experiments and modeling of urania-ceria system and submit paper for publication
2013Pure Feedstock (Np+Am)INLInitiate pure Am metal production for fuel research and Development
2013Advanced Technique and Reference Material DevelopmentLANLIssue report on assessment of advanced NDE and path forward for AFC-2C testing
2013Advanced Fabrication Technique DevelopmentINL Install GACS furnace in casting laboratory glove box
2013AFC Campaign ManagementINLConduct International ATF Workshop
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on FFTF Legacy Metallic Fuels
2013Advanced FR CladdingLANLFabricate ODS Steel tubing for BOR-60 Irradiation
2013Severe Accident Test Station Development and InstallationORNLComplete design and construction of (ex-cell) LOCA quench furnace
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLIssue PIE Report on EBR-II Legacy Metallic Fuels
2013Route to production and qualification of FCM fuelORNLReport Documenting Production Process, Thermophysical Properties, and QA Process to be Applied to First Irradiation Batch of FCM Fuels
2013Advanced Fabrication Technique DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS
2013Post Irradiation Examination of Surrogate Microencapsulated Fuels Irradiated in FY-2012ORNLIssue final PIE Report on Matrix Stability and Pellet Clad Interaction of FCM-E Series Capsules.
2013Advanced UN kernel synthesisORNLIssue progress report documenting results of UN kernel fabrication
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLDemonstration of evolutionary enhancements to UO2 fuel performance
2013Thin walled Tube Development and TestingORNLProvide report on development and characterization of high toughness nanostructured ferritic alloy for cladding
2013Transient Testing Plan for ATFINLIssue a Conceptual (Draft) Transient Testing Plan
2013Advanced Accident Tolerant Ceramic Fuel DevelopmentLANLAssessment of advanced cladding effects on LWR fuel thermochemistry under off-normal and accident conditions
2013Development microencapsulated fuel for advanced platforms including FCM for LWRORNLCompilation of Properties and Microstructure of Optimized FCM Fuel
2013High Density Fuel Material for LWRsINLDeliver Report documenting fabrication of high density fuel specimens that support development of accident tolerant fuels
2013Complete feasibility assessments of advanced sensors for in-pile fuel performance measurementsINLIssue Summary Report on Advanced Sensor Development; recommend technology for near-term deployment in SET-1 and identify remaining tasks
2013Laser Based Characterization / PIE TechniquesINLDesign and begin construction of sample loading and heating apparatus for measurement of mechanical and thermal properties
2013Metal fuel performance Sensitivity Assessment, NEAMS Interface, and SET plan updateLANLIssue summary report documenting fuel performance modeling results for selected rodlets from AFC irradiation experiments.
2013Targeted modeling support for UN kernel and Advanced Microencapsulated FuelsORNLReport on modeling and thermochemical and thermostructural evolution of LWR engineered fuel
2013Metallic Fuels Irradiation Testing in ATRINLReady to Insert AFC Outboard-A Year 2 Adv. Metallic Fuel Experiments (AFC-4A,4B) in ATR
2013Irradiation Testing in HFIRORNLComplete fabrication of three rabbit capsules containing metallic fuels for irradiation in HFIR
2013LWR Fuels Irradiation Testing in ATRINLATF-1 Experiment ATR Design Acceptance
2013Advanced LWR Cladding & LOCA TestsORNLIssue report documenting joint LANL and ORNL Advanced LWR cladding materials LOCA testing
2013AFC Campaign ManagementINLIssue AFC 2013 Accomplishments Report
2013Severe Accident Test Station Development and InstallationORNLComplete in-cell installation of High-Temperature capability for Severe Accident Test Station.
2013Advanced Technique and Reference Material DevelopmentLANLComplete dry run using clad dUO2 rodlets with structures/defects tailored to define current advanced NDE capabilities
2013PIE and reports (EBR-II, FFTF, AFC series, HFIR)INLComplete dry run with TN-106 complete, HFEF ready to receive FUTURIX-FTA shipment
2012Advanced Fuels Impact on LWR operationsBNLInitial assessment of the impact of innovative LWR fuels on LWR operating and safety envelopes
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2011 Accomplishments Report (funded by carryover)
2012Characterization of metal fuel samplesINLProduce draft report on AFC-3 fuel characterization. (carryover)
2012Remote Fuel Fabrication DevelopmentINLInstall GACS furnace in casting laboratory glove box
2012Postirradiation ExaminationINLIssue Final PIE Report on AFC-2B, 2C metallic and oxide Fuels
2012Remote Fuel Fabrication DevelopmentINLInitiate casting of minor actinide bearing fuel samples in GACS (carryover)
2012Campaign Management & IntegrationINLIssue draft Rev 2 of the AFC Execution Plan (submitted to DOE)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on Legacy FFTF Oxide Fuels
2012Laser-based Characterization/PIE TechniquesINLInitiate mock-up of a multifunctional prototype laser ultrasound instrument.
2012Fabrication of Metal Fuel Samples INLFabricate and characterize of HFIR rabbit TEM samples
2012Pure feedstock (Np+Am) + inventory reportINLProduce 5-20 grams of high purity Np metal (FY11 carryover funded)
2012Characterization of metal fuel samplesINLIssue report on STDM thermal diffusivity measurements on irradiated fuels (ATR and/or HFIR)
2012Postirradiation ExaminationINLIssue Baseline PIE Report on EBR-II fuels
2012 Technique Application to Highly Radioactive SamplesINLDemonstrate measurement of material microstructure changes, such as porosity, by a non-laser based thermoacoustic technique for in-pile applications
2012Coating Fabrication Development FCCI mitigationINLFabricate coated tube for performing fuels irradiation
2012Pure feedstock (Np+Am) + inventory reportINLInitiate pure Am metal production for fuel research and development
2012Nuclear Data MeasurementsINLDocument detailed analysis of the single sextant U-238/U-235 engineering in-beam data.
2012Campaign Management & IntegrationINLIssue Advanced Fuels 2012 Accomplishments Report
2012Advanced Steel Development for LWR CladdingLANLSelect a set of priority innovative alloys for clad development
2012Advanced Process DevelopmentLANLReport on MOX/MA-MOX sintering kinetics
2012Performance and Separate Effects TestingLANLFabricate initial baseline U-based ceramic research and development test samples for HFIR rabbit irradiation
2012HT-9 Knowledge Base TestingLANLPrepare mechanical test specimens from ACO-3 duct for re-irradiation in BOR-60
2012Reference Materials and Technique DevelopmentLANLSynthesis of Xe-embedded UO2 thick films of tailored gas bubble structure for fission gas behavior studies
2012Metal Fuel Performance Sensitivity Assessment NEAMS Interface and SET plan updateLANLComplete initial Assessment of Metal Fuel Sensitivity & validation data set
2012HFIR IrradiationsORNLInitiate first low-dose irradiation of metallic fuel specimens using HFIR hydraulic rabbit
2012Continued LWR FCM DevelopmentORNLReport documenting results of optimized FCM fuel including matrix-entraind poison development with LEU TRISO
2012PIE Examination of HFIR Irradiated Surrogate FCM FuelsORNLIssue preliminary PIE report on surrogate FCM fuel irradiation
2012Thermodynamics, Thermomechanics and Experimental Model VerificationORNLReport on thermodynamic and thermomechanic aspects of LWR applications of FCM fuel including Ag attack, reduced buffer layer thickness and UN thermodynamic stability.
2012Advanced LWR cladding (LOCA tests)ORNLProvide input to a report on LOCA testing of Advanced LWR cladding materials
2012Properties and Advanced CharacterizationORNLEstablish thermokinetic model framework for oxidation kinetics of UO2 LWR fuel
2012Nuclear Data Evaluations and Covariance Production ORNLDeliver Pu-239 resonance evaluation with covariance data for benchmark testing
2012High-Dose Materials TestingPNNLComplete summary report on testing of FFTF/MOTA specimens up to 200 dpa
2012Metallic fuels for LWRsPNNLU-Mo corrosion and extrusion development status report