Year | Work Package Title | Site | MS Title |
---|---|---|---|
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test LOC-C-3 |
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test TWIST-RIA-C |
2024 | HERA HBU Testing | INL | Complete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests. |
2024 | PIE of Byron HBU Fuel Pins | INL | Receive Byron Fuel Shipment |
2024 | PIE of Byron HBU Fuel Pins | INL | Initiate hydrogen and burnup measurements on Byron HBU supporting refabrication |
2024 | AR Campaign Management | INL | Draft topical report on reference metallic fuel design basis |
2024 | Advanced Fabrication Development | INL | Issue Report on metallic fuel Fabrication Technology Gaps |
2024 | AR Irradiation Testing | INL | FIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete THOR-MOXTOP-2 test plan (nominally 2 transients) |
2024 | Metallic fuel assessment and model development | INL | Preliminary metallic fuel performance code assessment to support topical report development |
2024 | PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFF | INL | Draft manuscript on new FCCI data Ð microstructure and micro mechanical characterization |
2024 | Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain Measure | INL | Report on hotcell DIC options and conceptual design details |
2024 | I-Loop Installation | INL | Release the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP |
2024 | I-Loop Installation | INL | Develop draft strategy to establish US domestic I Loop Tube supply capability |
2024 | I-Loop Installation | INL | Complete fabrication of the Transfer Shield Plate and Shield Cylinder |
2024 | Refabrication/Reinstrumentation Capability Development | INL | Perform refabrication on a Byron fuel rodlet |
2024 | Accelerated ceramic fuel development | LANL | Report on Thermomechanical property and creep behavior of ATF ceramic fuels |
2024 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication of FAST test articles, both Cr-doped and undoped UO2 |
2024 | Mechanical testing and modeling of cladding | LANL | Report on FeCrAl deformation creep model refinement |
2024 | AR Roadmap and constitutive creep model development | LANL | Prepare draft Advanced reactor cladding roadmap program plan |
2024 | Fabrication and Characterization of Coated Cladding | ORNL | Report on The effects of heating rate and hydrogen on cladding creep behavior |
2024 | High Burnup Fuel Performance | ORNL | Report on H.B. Robinson LOCA Test and PIE |
2024 | High Performance ATF (SiC) Cladding Development | ORNL | Report on SiC modeling Supporting Tube bowing evaluations |
2024 | SiC Cladding HFIR Irradiation Design | ORNL | High Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness |
2023 | Integral Irradiation Testing | INL | Issue ATF-2 Ramp Conceptual Design Report |
2023 | HERA PreH Campaign | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2023 | HERA Hotcell | INL | PIE report on HERA PreH Series |
2023 | ATF/HBU Transient Testing | INL | Complete HBU LOCA experiment preliminary design |
2023 | ATF PIE INL | INL | Coated Cladding Performance in ATF2 Comparison Report |
2023 | AR Campaign Management | INL | Draft Metallic Fuel Research and Development Plan |
2023 | AF Irradiation Testing & PIE | INL | Draft manuscript on destructive PIE and assessment on FAST-1 rodlets |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete assembly and irradiation of first previously irradiated pin in THOR |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete THOR-MOXTOP test plan in BUSTER (nominally 4 transients) |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Preliminary assessment and PIE report for THOR metallic fuel experiments |
2023 | Na loop infrastructure at IDEF | INL | Place order for a new glovebox |
2023 | Na loop infrastructure at IDEF | INL | Receive the sodium Test Loop from TerraPower |
2023 | Design and Install I-loop | INL | Complete Transfer Shield Plate final design |
2023 | Design and Install I-loop | INL | Initiate procurement of four primary loop coolant pumps |
2023 | Design and Install I-loop | INL | Complete conceptual design Cubicle and Cleanup System |
2023 | Design and Install I-loop | INL | Complete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC |
2023 | TWIST Commissioning | INL | First commissioning test assembled |
2023 | TREAT Reinstrumentation Capability (non capital) | INL | Complete fabrication of a new in-cell welding under pressure system (ICWUPS) |
2023 | Accelerated Ceramic Fuel Development | LANL | Prepare Handbook for ATF doped UO2 |
2023 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2023 | Mechanical testing and modeling of Coated Zircaloy | LANL | Complete high temperature ringpull tests on Cr coated Zircaloy Tube |
2023 | Matrix/BOR-60 shipment support plus line 35 type SOWs | LANL | Summary of HT9 and CWD9 cladding properties, design equations, and data gaps |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of LFA measurements on Cr-coated cladding tubes |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of the impact of the coating on high temperature creep and burst margin |
2023 | ATF Fuel Safety | ORNL | Report summarizing SATS enhanced capabilities and hot cell readiness |
2023 | High Burnup Fuel Performance | ORNL | Report summarizing tFGR and visualization data on high burnup |
2023 | High Performance ATF (SiC) Cladding Development | ORNL | SiC/SiC Development Strategy and 5-yr Execution Plan |
2022 | Integral Irradiation Testing | INL | ATF-2C test train top tier assembled and ready for insertion |
2022 | HERA | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2022 | Integral Transient Testing | INL | Draft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT |
2022 | ATF Post Irradiation Examination | INL | Draft Manuscript on optimized tensile testing of irradiated cladding |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Conduct Preliminary Design Review for THOR Remote Handling and Process Equipment |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Complete THOR commissioning test plan in BUSTER (nominally 3 transients) |
2022 | Accelerated Ceramic Fuel Development | LANL | Status report on doped UO2 properties and performance |
2022 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2022 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2022 | Develop HBu Transient FGR Capability | ORNL | Report summarizing design for SATS fission gas release capability and proof of concept experiment demonstration |
2022 | Characterization of High Burnup Fuel Samples | ORNL | Report summarizing high burnup microstructural data of commercially irradiated fuel |
2021 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2021 | Integral Irradiation Testing of ATF in ATR | INL | Issue ATF-2B Final Irradiation Report |
2021 | ATF PIE - Coordination /Support | INL | Complete Mechanical Testing Demonstrations |
2021 | LOCA Commissioning Capsule Tests | INL | Complete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT |
2021 | HERA | INL | Conduct Final Design Review for Simulated HBU Test for HERA |
2021 | Demonstration TREAT Tests on Previously Irradiated Fuel | INL | Complete first TREAT test with Previously Irradiated Fuel |
2021 | Perform evaluation of FAST application to U-10Zr/HT9 system | INL | Receipt of Irradiated FAST-1 capsules at HFEF |
2021 | ARES Joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Perform first modern transient irradiation experiment on metallic fuel |
2021 | TREAT Refabrication Capability (Capital) | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2021 | TREAT Reinstrumentation Capability | INL | Issue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple. |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Receive Top Head Closure Plate from vendor |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Ready to Install and Test THCP |
2021 | Advanced Ceramic Fuel Development | LANL | Report on the integrated experimental and modeling approach to enhanced grain size UO2 |
2021 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2021 | Fabrication and Characterization of Coated Cladding | ORNL | Issue report documenting characterization of coated Zry-4 cladding for round robin testing |
2021 | ATF Irradiation and Accelerated Qualification | ORNL | HFIR SiC Bowing Test Ready to Insert |
2021 | Transient Testing | ORNL | Issue report on impact of Cr coatings on transient response |
2021 | Westinghouse ATF FOA | PNNL | PNNL - W/Byron spent fuel rods feasibility assessment |
2020 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2020 | ATF-2 ATR Loop Design | INL | New ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion |
2020 | ATF Transient Testing | INL | Perform transients on ATF concepts in SETH capsule (~3 transients) |
2020 | ATF Transient Testing | INL | Complete MARCH-SERTTA commissioning tests |
2020 | LOCA Testing | INL | Complete preliminary design of TREAT LOCA test |
2020 | Irradiation Testing in ATR | INL | FAST-1 accelerated test ready for insertion in ATR |
2020 | Remote Handling Capability for Transient Testing | INL | Demonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell |
2020 | Re-fabrication and Instrumentation Techniques | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2020 | Evolution of Fuel Structure, Chemistry, & Properties following Irradiation | ORNL | Issue Report Summarizing Complete PIE of Gen1 MiniFuel Samples |
2020 | Irradiation of ATF Concepts in HFIR | ORNL | Monolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion |
Year | Work Package Title | Site | MS Title |
---|---|---|---|
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test LOC-C-3 |
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test TWIST-RIA-C |
2024 | HERA HBU Testing | INL | Complete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests. |
2024 | PIE of Byron HBU Fuel Pins | INL | Receive Byron Fuel Shipment |
2024 | PIE of Byron HBU Fuel Pins | INL | Initiate hydrogen and burnup measurements on Byron HBU supporting refabrication |
2024 | AR Campaign Management | INL | Draft topical report on reference metallic fuel design basis |
2024 | Advanced Fabrication Development | INL | Issue Report on metallic fuel Fabrication Technology Gaps |
2024 | AR Irradiation Testing | INL | FIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete THOR-MOXTOP-2 test plan (nominally 2 transients) |
2024 | Metallic fuel assessment and model development | INL | Preliminary metallic fuel performance code assessment to support topical report development |
2024 | PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFF | INL | Draft manuscript on new FCCI data Ð microstructure and micro mechanical characterization |
2024 | Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain Measure | INL | Report on hotcell DIC options and conceptual design details |
2024 | I-Loop Installation | INL | Release the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP |
2024 | I-Loop Installation | INL | Develop draft strategy to establish US domestic I Loop Tube supply capability |
2024 | I-Loop Installation | INL | Complete fabrication of the Transfer Shield Plate and Shield Cylinder |
2024 | Refabrication/Reinstrumentation Capability Development | INL | Perform refabrication on a Byron fuel rodlet |
2024 | Accelerated ceramic fuel development | LANL | Report on Thermomechanical property and creep behavior of ATF ceramic fuels |
2024 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication of FAST test articles, both Cr-doped and undoped UO2 |
2024 | Mechanical testing and modeling of cladding | LANL | Report on FeCrAl deformation creep model refinement |
2024 | AR Roadmap and constitutive creep model development | LANL | Prepare draft Advanced reactor cladding roadmap program plan |
2024 | Fabrication and Characterization of Coated Cladding | ORNL | Report on The effects of heating rate and hydrogen on cladding creep behavior |
2024 | High Burnup Fuel Performance | ORNL | Report on H.B. Robinson LOCA Test and PIE |
2024 | High Performance ATF (SiC) Cladding Development | ORNL | Report on SiC modeling Supporting Tube bowing evaluations |
2024 | SiC Cladding HFIR Irradiation Design | ORNL | High Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness |
2023 | Integral Irradiation Testing | INL | Issue ATF-2 Ramp Conceptual Design Report |
2023 | HERA PreH Campaign | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2023 | HERA Hotcell | INL | PIE report on HERA PreH Series |
2023 | ATF/HBU Transient Testing | INL | Complete HBU LOCA experiment preliminary design |
2023 | ATF PIE INL | INL | Coated Cladding Performance in ATF2 Comparison Report |
2023 | AR Campaign Management | INL | Draft Metallic Fuel Research and Development Plan |
2023 | AF Irradiation Testing & PIE | INL | Draft manuscript on destructive PIE and assessment on FAST-1 rodlets |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete assembly and irradiation of first previously irradiated pin in THOR |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete THOR-MOXTOP test plan in BUSTER (nominally 4 transients) |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Preliminary assessment and PIE report for THOR metallic fuel experiments |
2023 | Na loop infrastructure at IDEF | INL | Place order for a new glovebox |
2023 | Na loop infrastructure at IDEF | INL | Receive the sodium Test Loop from TerraPower |
2023 | Design and Install I-loop | INL | Complete Transfer Shield Plate final design |
2023 | Design and Install I-loop | INL | Initiate procurement of four primary loop coolant pumps |
2023 | Design and Install I-loop | INL | Complete conceptual design Cubicle and Cleanup System |
2023 | Design and Install I-loop | INL | Complete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC |
2023 | TWIST Commissioning | INL | First commissioning test assembled |
2023 | TREAT Reinstrumentation Capability (non capital) | INL | Complete fabrication of a new in-cell welding under pressure system (ICWUPS) |
2023 | Accelerated Ceramic Fuel Development | LANL | Prepare Handbook for ATF doped UO2 |
2023 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2023 | Mechanical testing and modeling of Coated Zircaloy | LANL | Complete high temperature ringpull tests on Cr coated Zircaloy Tube |
2023 | Matrix/BOR-60 shipment support plus line 35 type SOWs | LANL | Summary of HT9 and CWD9 cladding properties, design equations, and data gaps |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of LFA measurements on Cr-coated cladding tubes |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of the impact of the coating on high temperature creep and burst margin |
2023 | ATF Fuel Safety | ORNL | Report summarizing SATS enhanced capabilities and hot cell readiness |
2023 | High Burnup Fuel Performance | ORNL | Report summarizing tFGR and visualization data on high burnup |
2023 | High Performance ATF (SiC) Cladding Development | ORNL | SiC/SiC Development Strategy and 5-yr Execution Plan |
2022 | Integral Irradiation Testing | INL | ATF-2C test train top tier assembled and ready for insertion |
2022 | HERA | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2022 | Integral Transient Testing | INL | Draft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT |
2022 | ATF Post Irradiation Examination | INL | Draft Manuscript on optimized tensile testing of irradiated cladding |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Conduct Preliminary Design Review for THOR Remote Handling and Process Equipment |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Complete THOR commissioning test plan in BUSTER (nominally 3 transients) |
2022 | Accelerated Ceramic Fuel Development | LANL | Status report on doped UO2 properties and performance |
2022 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2022 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2022 | Develop HBu Transient FGR Capability | ORNL | Report summarizing design for SATS fission gas release capability and proof of concept experiment demonstration |
2022 | Characterization of High Burnup Fuel Samples | ORNL | Report summarizing high burnup microstructural data of commercially irradiated fuel |
2021 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2021 | Integral Irradiation Testing of ATF in ATR | INL | Issue ATF-2B Final Irradiation Report |
2021 | ATF PIE - Coordination /Support | INL | Complete Mechanical Testing Demonstrations |
2021 | LOCA Commissioning Capsule Tests | INL | Complete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT |
2021 | HERA | INL | Conduct Final Design Review for Simulated HBU Test for HERA |
2021 | Demonstration TREAT Tests on Previously Irradiated Fuel | INL | Complete first TREAT test with Previously Irradiated Fuel |
2021 | Perform evaluation of FAST application to U-10Zr/HT9 system | INL | Receipt of Irradiated FAST-1 capsules at HFEF |
2021 | ARES Joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Perform first modern transient irradiation experiment on metallic fuel |
2021 | TREAT Refabrication Capability (Capital) | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2021 | TREAT Reinstrumentation Capability | INL | Issue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple. |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Receive Top Head Closure Plate from vendor |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Ready to Install and Test THCP |
2021 | Advanced Ceramic Fuel Development | LANL | Report on the integrated experimental and modeling approach to enhanced grain size UO2 |
2021 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2021 | Fabrication and Characterization of Coated Cladding | ORNL | Issue report documenting characterization of coated Zry-4 cladding for round robin testing |
2021 | ATF Irradiation and Accelerated Qualification | ORNL | HFIR SiC Bowing Test Ready to Insert |
2021 | Transient Testing | ORNL | Issue report on impact of Cr coatings on transient response |
2021 | Westinghouse ATF FOA | PNNL | PNNL - W/Byron spent fuel rods feasibility assessment |
2020 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2020 | ATF-2 ATR Loop Design | INL | New ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion |
2020 | ATF Transient Testing | INL | Perform transients on ATF concepts in SETH capsule (~3 transients) |
2020 | ATF Transient Testing | INL | Complete MARCH-SERTTA commissioning tests |
2020 | LOCA Testing | INL | Complete preliminary design of TREAT LOCA test |
2020 | Irradiation Testing in ATR | INL | FAST-1 accelerated test ready for insertion in ATR |
2020 | Remote Handling Capability for Transient Testing | INL | Demonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell |
2020 | Re-fabrication and Instrumentation Techniques | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2020 | Evolution of Fuel Structure, Chemistry, & Properties following Irradiation | ORNL | Issue Report Summarizing Complete PIE of Gen1 MiniFuel Samples |
2020 | Irradiation of ATF Concepts in HFIR | ORNL | Monolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion |
Year | Work Package Title | Site | MS Title |
---|---|---|---|
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test LOC-C-3 |
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test TWIST-RIA-C |
2024 | HERA HBU Testing | INL | Complete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests. |
2024 | PIE of Byron HBU Fuel Pins | INL | Receive Byron Fuel Shipment |
2024 | PIE of Byron HBU Fuel Pins | INL | Initiate hydrogen and burnup measurements on Byron HBU supporting refabrication |
2024 | AR Campaign Management | INL | Draft topical report on reference metallic fuel design basis |
2024 | Advanced Fabrication Development | INL | Issue Report on metallic fuel Fabrication Technology Gaps |
2024 | AR Irradiation Testing | INL | FIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete THOR-MOXTOP-2 test plan (nominally 2 transients) |
2024 | Metallic fuel assessment and model development | INL | Preliminary metallic fuel performance code assessment to support topical report development |
2024 | PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFF | INL | Draft manuscript on new FCCI data Ð microstructure and micro mechanical characterization |
2024 | Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain Measure | INL | Report on hotcell DIC options and conceptual design details |
2024 | I-Loop Installation | INL | Release the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP |
2024 | I-Loop Installation | INL | Develop draft strategy to establish US domestic I Loop Tube supply capability |
2024 | I-Loop Installation | INL | Complete fabrication of the Transfer Shield Plate and Shield Cylinder |
2024 | Refabrication/Reinstrumentation Capability Development | INL | Perform refabrication on a Byron fuel rodlet |
2024 | Accelerated ceramic fuel development | LANL | Report on Thermomechanical property and creep behavior of ATF ceramic fuels |
2024 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication of FAST test articles, both Cr-doped and undoped UO2 |
2024 | Mechanical testing and modeling of cladding | LANL | Report on FeCrAl deformation creep model refinement |
2024 | AR Roadmap and constitutive creep model development | LANL | Prepare draft Advanced reactor cladding roadmap program plan |
2024 | Fabrication and Characterization of Coated Cladding | ORNL | Report on The effects of heating rate and hydrogen on cladding creep behavior |
2024 | High Burnup Fuel Performance | ORNL | Report on H.B. Robinson LOCA Test and PIE |
2024 | High Performance ATF (SiC) Cladding Development | ORNL | Report on SiC modeling Supporting Tube bowing evaluations |
2024 | SiC Cladding HFIR Irradiation Design | ORNL | High Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness |
2023 | Integral Irradiation Testing | INL | Issue ATF-2 Ramp Conceptual Design Report |
2023 | HERA PreH Campaign | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2023 | HERA Hotcell | INL | PIE report on HERA PreH Series |
2023 | ATF/HBU Transient Testing | INL | Complete HBU LOCA experiment preliminary design |
2023 | ATF PIE INL | INL | Coated Cladding Performance in ATF2 Comparison Report |
2023 | AR Campaign Management | INL | Draft Metallic Fuel Research and Development Plan |
2023 | AF Irradiation Testing & PIE | INL | Draft manuscript on destructive PIE and assessment on FAST-1 rodlets |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete assembly and irradiation of first previously irradiated pin in THOR |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete THOR-MOXTOP test plan in BUSTER (nominally 4 transients) |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Preliminary assessment and PIE report for THOR metallic fuel experiments |
2023 | Na loop infrastructure at IDEF | INL | Place order for a new glovebox |
2023 | Na loop infrastructure at IDEF | INL | Receive the sodium Test Loop from TerraPower |
2023 | Design and Install I-loop | INL | Complete Transfer Shield Plate final design |
2023 | Design and Install I-loop | INL | Initiate procurement of four primary loop coolant pumps |
2023 | Design and Install I-loop | INL | Complete conceptual design Cubicle and Cleanup System |
2023 | Design and Install I-loop | INL | Complete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC |
2023 | TWIST Commissioning | INL | First commissioning test assembled |
2023 | TREAT Reinstrumentation Capability (non capital) | INL | Complete fabrication of a new in-cell welding under pressure system (ICWUPS) |
2023 | Accelerated Ceramic Fuel Development | LANL | Prepare Handbook for ATF doped UO2 |
2023 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2023 | Mechanical testing and modeling of Coated Zircaloy | LANL | Complete high temperature ringpull tests on Cr coated Zircaloy Tube |
2023 | Matrix/BOR-60 shipment support plus line 35 type SOWs | LANL | Summary of HT9 and CWD9 cladding properties, design equations, and data gaps |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of LFA measurements on Cr-coated cladding tubes |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of the impact of the coating on high temperature creep and burst margin |
2023 | ATF Fuel Safety | ORNL | Report summarizing SATS enhanced capabilities and hot cell readiness |
2023 | High Burnup Fuel Performance | ORNL | Report summarizing tFGR and visualization data on high burnup |
2023 | High Performance ATF (SiC) Cladding Development | ORNL | SiC/SiC Development Strategy and 5-yr Execution Plan |
2022 | Integral Irradiation Testing | INL | ATF-2C test train top tier assembled and ready for insertion |
2022 | HERA | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2022 | Integral Transient Testing | INL | Draft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT |
2022 | ATF Post Irradiation Examination | INL | Draft Manuscript on optimized tensile testing of irradiated cladding |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Conduct Preliminary Design Review for THOR Remote Handling and Process Equipment |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Complete THOR commissioning test plan in BUSTER (nominally 3 transients) |
2022 | Accelerated Ceramic Fuel Development | LANL | Status report on doped UO2 properties and performance |
2022 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2022 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2022 | Develop HBu Transient FGR Capability | ORNL | Report summarizing design for SATS fission gas release capability and proof of concept experiment demonstration |
2022 | Characterization of High Burnup Fuel Samples | ORNL | Report summarizing high burnup microstructural data of commercially irradiated fuel |
2021 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2021 | Integral Irradiation Testing of ATF in ATR | INL | Issue ATF-2B Final Irradiation Report |
2021 | ATF PIE - Coordination /Support | INL | Complete Mechanical Testing Demonstrations |
2021 | LOCA Commissioning Capsule Tests | INL | Complete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT |
2021 | HERA | INL | Conduct Final Design Review for Simulated HBU Test for HERA |
2021 | Demonstration TREAT Tests on Previously Irradiated Fuel | INL | Complete first TREAT test with Previously Irradiated Fuel |
2021 | Perform evaluation of FAST application to U-10Zr/HT9 system | INL | Receipt of Irradiated FAST-1 capsules at HFEF |
2021 | ARES Joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Perform first modern transient irradiation experiment on metallic fuel |
2021 | TREAT Refabrication Capability (Capital) | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2021 | TREAT Reinstrumentation Capability | INL | Issue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple. |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Receive Top Head Closure Plate from vendor |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Ready to Install and Test THCP |
2021 | Advanced Ceramic Fuel Development | LANL | Report on the integrated experimental and modeling approach to enhanced grain size UO2 |
2021 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2021 | Fabrication and Characterization of Coated Cladding | ORNL | Issue report documenting characterization of coated Zry-4 cladding for round robin testing |
2021 | ATF Irradiation and Accelerated Qualification | ORNL | HFIR SiC Bowing Test Ready to Insert |
2021 | Transient Testing | ORNL | Issue report on impact of Cr coatings on transient response |
2021 | Westinghouse ATF FOA | PNNL | PNNL - W/Byron spent fuel rods feasibility assessment |
2020 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2020 | ATF-2 ATR Loop Design | INL | New ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion |
2020 | ATF Transient Testing | INL | Perform transients on ATF concepts in SETH capsule (~3 transients) |
2020 | ATF Transient Testing | INL | Complete MARCH-SERTTA commissioning tests |
2020 | LOCA Testing | INL | Complete preliminary design of TREAT LOCA test |
2020 | Irradiation Testing in ATR | INL | FAST-1 accelerated test ready for insertion in ATR |
2020 | Remote Handling Capability for Transient Testing | INL | Demonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell |
2020 | Re-fabrication and Instrumentation Techniques | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2020 | Evolution of Fuel Structure, Chemistry, & Properties following Irradiation | ORNL | Issue Report Summarizing Complete PIE of Gen1 MiniFuel Samples |
2020 | Irradiation of ATF Concepts in HFIR | ORNL | Monolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion |
Year | Work Package Title | Site | MS Title |
---|---|---|---|
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test LOC-C-3 |
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test TWIST-RIA-C |
2024 | HERA HBU Testing | INL | Complete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests. |
2024 | PIE of Byron HBU Fuel Pins | INL | Receive Byron Fuel Shipment |
2024 | PIE of Byron HBU Fuel Pins | INL | Initiate hydrogen and burnup measurements on Byron HBU supporting refabrication |
2024 | AR Campaign Management | INL | Draft topical report on reference metallic fuel design basis |
2024 | Advanced Fabrication Development | INL | Issue Report on metallic fuel Fabrication Technology Gaps |
2024 | AR Irradiation Testing | INL | FIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete THOR-MOXTOP-2 test plan (nominally 2 transients) |
2024 | Metallic fuel assessment and model development | INL | Preliminary metallic fuel performance code assessment to support topical report development |
2024 | PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFF | INL | Draft manuscript on new FCCI data Ð microstructure and micro mechanical characterization |
2024 | Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain Measure | INL | Report on hotcell DIC options and conceptual design details |
2024 | I-Loop Installation | INL | Release the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP |
2024 | I-Loop Installation | INL | Develop draft strategy to establish US domestic I Loop Tube supply capability |
2024 | I-Loop Installation | INL | Complete fabrication of the Transfer Shield Plate and Shield Cylinder |
2024 | Refabrication/Reinstrumentation Capability Development | INL | Perform refabrication on a Byron fuel rodlet |
2024 | Accelerated ceramic fuel development | LANL | Report on Thermomechanical property and creep behavior of ATF ceramic fuels |
2024 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication of FAST test articles, both Cr-doped and undoped UO2 |
2024 | Mechanical testing and modeling of cladding | LANL | Report on FeCrAl deformation creep model refinement |
2024 | AR Roadmap and constitutive creep model development | LANL | Prepare draft Advanced reactor cladding roadmap program plan |
2024 | Fabrication and Characterization of Coated Cladding | ORNL | Report on The effects of heating rate and hydrogen on cladding creep behavior |
2024 | High Burnup Fuel Performance | ORNL | Report on H.B. Robinson LOCA Test and PIE |
2024 | High Performance ATF (SiC) Cladding Development | ORNL | Report on SiC modeling Supporting Tube bowing evaluations |
2024 | SiC Cladding HFIR Irradiation Design | ORNL | High Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness |
2023 | Integral Irradiation Testing | INL | Issue ATF-2 Ramp Conceptual Design Report |
2023 | HERA PreH Campaign | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2023 | HERA Hotcell | INL | PIE report on HERA PreH Series |
2023 | ATF/HBU Transient Testing | INL | Complete HBU LOCA experiment preliminary design |
2023 | ATF PIE INL | INL | Coated Cladding Performance in ATF2 Comparison Report |
2023 | AR Campaign Management | INL | Draft Metallic Fuel Research and Development Plan |
2023 | AF Irradiation Testing & PIE | INL | Draft manuscript on destructive PIE and assessment on FAST-1 rodlets |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete assembly and irradiation of first previously irradiated pin in THOR |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete THOR-MOXTOP test plan in BUSTER (nominally 4 transients) |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Preliminary assessment and PIE report for THOR metallic fuel experiments |
2023 | Na loop infrastructure at IDEF | INL | Place order for a new glovebox |
2023 | Na loop infrastructure at IDEF | INL | Receive the sodium Test Loop from TerraPower |
2023 | Design and Install I-loop | INL | Complete Transfer Shield Plate final design |
2023 | Design and Install I-loop | INL | Initiate procurement of four primary loop coolant pumps |
2023 | Design and Install I-loop | INL | Complete conceptual design Cubicle and Cleanup System |
2023 | Design and Install I-loop | INL | Complete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC |
2023 | TWIST Commissioning | INL | First commissioning test assembled |
2023 | TREAT Reinstrumentation Capability (non capital) | INL | Complete fabrication of a new in-cell welding under pressure system (ICWUPS) |
2023 | Accelerated Ceramic Fuel Development | LANL | Prepare Handbook for ATF doped UO2 |
2023 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2023 | Mechanical testing and modeling of Coated Zircaloy | LANL | Complete high temperature ringpull tests on Cr coated Zircaloy Tube |
2023 | Matrix/BOR-60 shipment support plus line 35 type SOWs | LANL | Summary of HT9 and CWD9 cladding properties, design equations, and data gaps |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of LFA measurements on Cr-coated cladding tubes |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of the impact of the coating on high temperature creep and burst margin |
2023 | ATF Fuel Safety | ORNL | Report summarizing SATS enhanced capabilities and hot cell readiness |
2023 | High Burnup Fuel Performance | ORNL | Report summarizing tFGR and visualization data on high burnup |
2023 | High Performance ATF (SiC) Cladding Development | ORNL | SiC/SiC Development Strategy and 5-yr Execution Plan |
2022 | Integral Irradiation Testing | INL | ATF-2C test train top tier assembled and ready for insertion |
2022 | HERA | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2022 | Integral Transient Testing | INL | Draft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT |
2022 | ATF Post Irradiation Examination | INL | Draft Manuscript on optimized tensile testing of irradiated cladding |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Conduct Preliminary Design Review for THOR Remote Handling and Process Equipment |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Complete THOR commissioning test plan in BUSTER (nominally 3 transients) |
2022 | Accelerated Ceramic Fuel Development | LANL | Status report on doped UO2 properties and performance |
2022 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2022 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2022 | Develop HBu Transient FGR Capability | ORNL | Report summarizing design for SATS fission gas release capability and proof of concept experiment demonstration |
2022 | Characterization of High Burnup Fuel Samples | ORNL | Report summarizing high burnup microstructural data of commercially irradiated fuel |
2021 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2021 | Integral Irradiation Testing of ATF in ATR | INL | Issue ATF-2B Final Irradiation Report |
2021 | ATF PIE - Coordination /Support | INL | Complete Mechanical Testing Demonstrations |
2021 | LOCA Commissioning Capsule Tests | INL | Complete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT |
2021 | HERA | INL | Conduct Final Design Review for Simulated HBU Test for HERA |
2021 | Demonstration TREAT Tests on Previously Irradiated Fuel | INL | Complete first TREAT test with Previously Irradiated Fuel |
2021 | Perform evaluation of FAST application to U-10Zr/HT9 system | INL | Receipt of Irradiated FAST-1 capsules at HFEF |
2021 | ARES Joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Perform first modern transient irradiation experiment on metallic fuel |
2021 | TREAT Refabrication Capability (Capital) | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2021 | TREAT Reinstrumentation Capability | INL | Issue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple. |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Receive Top Head Closure Plate from vendor |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Ready to Install and Test THCP |
2021 | Advanced Ceramic Fuel Development | LANL | Report on the integrated experimental and modeling approach to enhanced grain size UO2 |
2021 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2021 | Fabrication and Characterization of Coated Cladding | ORNL | Issue report documenting characterization of coated Zry-4 cladding for round robin testing |
2021 | ATF Irradiation and Accelerated Qualification | ORNL | HFIR SiC Bowing Test Ready to Insert |
2021 | Transient Testing | ORNL | Issue report on impact of Cr coatings on transient response |
2021 | Westinghouse ATF FOA | PNNL | PNNL - W/Byron spent fuel rods feasibility assessment |
2020 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2020 | ATF-2 ATR Loop Design | INL | New ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion |
2020 | ATF Transient Testing | INL | Perform transients on ATF concepts in SETH capsule (~3 transients) |
2020 | ATF Transient Testing | INL | Complete MARCH-SERTTA commissioning tests |
2020 | LOCA Testing | INL | Complete preliminary design of TREAT LOCA test |
2020 | Irradiation Testing in ATR | INL | FAST-1 accelerated test ready for insertion in ATR |
2020 | Remote Handling Capability for Transient Testing | INL | Demonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell |
2020 | Re-fabrication and Instrumentation Techniques | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2020 | Evolution of Fuel Structure, Chemistry, & Properties following Irradiation | ORNL | Issue Report Summarizing Complete PIE of Gen1 MiniFuel Samples |
2020 | Irradiation of ATF Concepts in HFIR | ORNL | Monolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion |
Year | Work Package Title | Site | MS Title |
---|---|---|---|
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test LOC-C-3 |
2024 | TWIST Commissioning | INL | Complete irradiation of TWIST Commissioning Test TWIST-RIA-C |
2024 | HERA HBU Testing | INL | Complete TWIST HBU experiment final design review meeting with report on detailed fuel performance predictions for first HBu tests. |
2024 | PIE of Byron HBU Fuel Pins | INL | Receive Byron Fuel Shipment |
2024 | PIE of Byron HBU Fuel Pins | INL | Initiate hydrogen and burnup measurements on Byron HBU supporting refabrication |
2024 | AR Campaign Management | INL | Draft topical report on reference metallic fuel design basis |
2024 | Advanced Fabrication Development | INL | Issue Report on metallic fuel Fabrication Technology Gaps |
2024 | AR Irradiation Testing | INL | FIDES AToMiC: Hold Preliminary Design Review for fueled drop in experiments |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete the fabrication of components for the first pre-irradiated THOR test for Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete assembly and irradiation of the first previously irradiated pin in the Large Experiment Capability |
2024 | Complete ARES Phase I project - irradiation and post-test analysis (THOR-C-3b,4,5,M-LOF) | INL | Complete THOR-MOXTOP-2 test plan (nominally 2 transients) |
2024 | Metallic fuel assessment and model development | INL | Preliminary metallic fuel performance code assessment to support topical report development |
2024 | PIE on legacy metallic fuel pins (FCCI and Therm Cond) - MFF | INL | Draft manuscript on new FCCI data Ð microstructure and micro mechanical characterization |
2024 | Develop Mechanical Testing Station for Irradiated SIC-SIC Cladding with In-situ Strain Measure | INL | Report on hotcell DIC options and conceptual design details |
2024 | I-Loop Installation | INL | Release the Transfer Shield Plate and Shield Cylinder fabrication subcontract RFP |
2024 | I-Loop Installation | INL | Develop draft strategy to establish US domestic I Loop Tube supply capability |
2024 | I-Loop Installation | INL | Complete fabrication of the Transfer Shield Plate and Shield Cylinder |
2024 | Refabrication/Reinstrumentation Capability Development | INL | Perform refabrication on a Byron fuel rodlet |
2024 | Accelerated ceramic fuel development | LANL | Report on Thermomechanical property and creep behavior of ATF ceramic fuels |
2024 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication of FAST test articles, both Cr-doped and undoped UO2 |
2024 | Mechanical testing and modeling of cladding | LANL | Report on FeCrAl deformation creep model refinement |
2024 | AR Roadmap and constitutive creep model development | LANL | Prepare draft Advanced reactor cladding roadmap program plan |
2024 | Fabrication and Characterization of Coated Cladding | ORNL | Report on The effects of heating rate and hydrogen on cladding creep behavior |
2024 | High Burnup Fuel Performance | ORNL | Report on H.B. Robinson LOCA Test and PIE |
2024 | High Performance ATF (SiC) Cladding Development | ORNL | Report on SiC modeling Supporting Tube bowing evaluations |
2024 | SiC Cladding HFIR Irradiation Design | ORNL | High Temperature SiC Cladding Bowing Irradiation Design and HFIR readiness |
2023 | Integral Irradiation Testing | INL | Issue ATF-2 Ramp Conceptual Design Report |
2023 | HERA PreH Campaign | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2023 | HERA Hotcell | INL | PIE report on HERA PreH Series |
2023 | ATF/HBU Transient Testing | INL | Complete HBU LOCA experiment preliminary design |
2023 | ATF PIE INL | INL | Coated Cladding Performance in ATF2 Comparison Report |
2023 | AR Campaign Management | INL | Draft Metallic Fuel Research and Development Plan |
2023 | AF Irradiation Testing & PIE | INL | Draft manuscript on destructive PIE and assessment on FAST-1 rodlets |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete assembly and irradiation of first previously irradiated pin in THOR |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Complete THOR-MOXTOP test plan in BUSTER (nominally 4 transients) |
2023 | Complete ARES Phase I project - irradiation and PIE | INL | Preliminary assessment and PIE report for THOR metallic fuel experiments |
2023 | Na loop infrastructure at IDEF | INL | Place order for a new glovebox |
2023 | Na loop infrastructure at IDEF | INL | Receive the sodium Test Loop from TerraPower |
2023 | Design and Install I-loop | INL | Complete Transfer Shield Plate final design |
2023 | Design and Install I-loop | INL | Initiate procurement of four primary loop coolant pumps |
2023 | Design and Install I-loop | INL | Complete conceptual design Cubicle and Cleanup System |
2023 | Design and Install I-loop | INL | Complete rip out of existing out-of-service equipment in 1A cubicle and 2C electrical MCC |
2023 | TWIST Commissioning | INL | First commissioning test assembled |
2023 | TREAT Reinstrumentation Capability (non capital) | INL | Complete fabrication of a new in-cell welding under pressure system (ICWUPS) |
2023 | Accelerated Ceramic Fuel Development | LANL | Prepare Handbook for ATF doped UO2 |
2023 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2023 | Mechanical testing and modeling of Coated Zircaloy | LANL | Complete high temperature ringpull tests on Cr coated Zircaloy Tube |
2023 | Matrix/BOR-60 shipment support plus line 35 type SOWs | LANL | Summary of HT9 and CWD9 cladding properties, design equations, and data gaps |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of LFA measurements on Cr-coated cladding tubes |
2023 | Fabrication and Characterization of Coated Cladding | ORNL | Summary of the impact of the coating on high temperature creep and burst margin |
2023 | ATF Fuel Safety | ORNL | Report summarizing SATS enhanced capabilities and hot cell readiness |
2023 | High Burnup Fuel Performance | ORNL | Report summarizing tFGR and visualization data on high burnup |
2023 | High Performance ATF (SiC) Cladding Development | ORNL | SiC/SiC Development Strategy and 5-yr Execution Plan |
2022 | Integral Irradiation Testing | INL | ATF-2C test train top tier assembled and ready for insertion |
2022 | HERA | INL | First two experiments on pre-hydrided cladding ready for irradiation |
2022 | Integral Transient Testing | INL | Draft Manuscript on the Resumption of Water Capsule RIA Testing at TREAT |
2022 | ATF Post Irradiation Examination | INL | Draft Manuscript on optimized tensile testing of irradiated cladding |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Conduct Preliminary Design Review for THOR Remote Handling and Process Equipment |
2022 | ARES - joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Complete THOR commissioning test plan in BUSTER (nominally 3 transients) |
2022 | Accelerated Ceramic Fuel Development | LANL | Status report on doped UO2 properties and performance |
2022 | Accelerated irradiation and qualification of ceramic nuclear fuels | LANL | Fabrication and shipment of ATF pellets for ATR insertion |
2022 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2022 | Develop HBu Transient FGR Capability | ORNL | Report summarizing design for SATS fission gas release capability and proof of concept experiment demonstration |
2022 | Characterization of High Burnup Fuel Samples | ORNL | Report summarizing high burnup microstructural data of commercially irradiated fuel |
2021 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2021 | Integral Irradiation Testing of ATF in ATR | INL | Issue ATF-2B Final Irradiation Report |
2021 | ATF PIE - Coordination /Support | INL | Complete Mechanical Testing Demonstrations |
2021 | LOCA Commissioning Capsule Tests | INL | Complete assembly of out-of-pile LOCA testbed device, the TWIST Prototype, to support LOCA testing in TREAT |
2021 | HERA | INL | Conduct Final Design Review for Simulated HBU Test for HERA |
2021 | Demonstration TREAT Tests on Previously Irradiated Fuel | INL | Complete first TREAT test with Previously Irradiated Fuel |
2021 | Perform evaluation of FAST application to U-10Zr/HT9 system | INL | Receipt of Irradiated FAST-1 capsules at HFEF |
2021 | ARES Joint work with JAEA to study off-normal behavior of fast reactor fuels | INL | Perform first modern transient irradiation experiment on metallic fuel |
2021 | TREAT Refabrication Capability (Capital) | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2021 | TREAT Reinstrumentation Capability | INL | Issue a report on the progress of researching, designing, and ultimately developing fuel rodlets instrumented with a fuel centerline thermocouple. |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Receive Top Head Closure Plate from vendor |
2021 | ATR I-Loop Installation (capital - TEC) | INL | Ready to Install and Test THCP |
2021 | Advanced Ceramic Fuel Development | LANL | Report on the integrated experimental and modeling approach to enhanced grain size UO2 |
2021 | Interface Mechanical property testing for coated zircaloy | LANL | Issue report on bulge testing and microscale testing on coated zircaloy |
2021 | Fabrication and Characterization of Coated Cladding | ORNL | Issue report documenting characterization of coated Zry-4 cladding for round robin testing |
2021 | ATF Irradiation and Accelerated Qualification | ORNL | HFIR SiC Bowing Test Ready to Insert |
2021 | Transient Testing | ORNL | Issue report on impact of Cr coatings on transient response |
2021 | Westinghouse ATF FOA | PNNL | PNNL - W/Byron spent fuel rods feasibility assessment |
2020 | AFC Coordination and Integration | INL | Complete Draft 2020 Accomplishments Report |
2020 | ATF-2 ATR Loop Design | INL | New ATF-2 Tier 5/6 ready for new Westinghouse rodlets and ATR insertion |
2020 | ATF Transient Testing | INL | Perform transients on ATF concepts in SETH capsule (~3 transients) |
2020 | ATF Transient Testing | INL | Complete MARCH-SERTTA commissioning tests |
2020 | LOCA Testing | INL | Complete preliminary design of TREAT LOCA test |
2020 | Irradiation Testing in ATR | INL | FAST-1 accelerated test ready for insertion in ATR |
2020 | Remote Handling Capability for Transient Testing | INL | Demonstrate ability to load an ATF-2 rodlet into a TREAT capsule in the HFEF hot cell |
2020 | Re-fabrication and Instrumentation Techniques | INL | Demonstrate ability to perform re-fabrication of fuel rods in mockup |
2020 | Evolution of Fuel Structure, Chemistry, & Properties following Irradiation | ORNL | Issue Report Summarizing Complete PIE of Gen1 MiniFuel Samples |
2020 | Irradiation of ATF Concepts in HFIR | ORNL | Monolithic ATF MiniFuel Sample Capsules Ready for HFIR Insertion |